Showing posts with label plans 2013. Show all posts
Showing posts with label plans 2013. Show all posts

Thursday, 8 May 2014

Summary of 2013

Yes, I know, it is May 2014, but I need to make plans for 2014 sewing year and because of this I should look at my 2013 sewing year%))

  • The main point of my 2013 plan was to make 20 items(as a part of my bet with Semeon about sewing 50 items in 2 year). I managed with it pretty good. I made 21 items%) We decided to extend our bet for a half of the year because of our moving. So I hope I would manage%) 
Let's see further.
  • to decrease my fabric stash by 30 meters  - I failed completely!%(( I don't have now Evernote with my stash's database so I will not scare you with the numbers!
  • to finish my 3 UFO (silk dress, gray dress, brown skirt) - no, I didn't make them. I have some big issue with finishing some started project but I have to do this finally.
  • to make different types of clothes (not only skirts%))  - 60% done.
    • pants - done
    • jacket
    • jacket (warm)
    • dress - done
    • blouse - done
    • skirt - done ( a lot of them!%)
    • vest
    • male shirt - done
    • top - done
    • bag
  • to make last summer's projects - 2 dress and the pants -  I made pants! I should photo them again and blog! I didn't have time for dresses:( 
  • to use 8 patterns from different companies (except Burda) - I made only one!%(
  • to try to make The Big Project - a leather jacket.  - I bought all ingredients - all zippers, lining etc. I even started to make a muslin. And then moved! I look forward to making this project.
  • to make a catalog of my patterns - in progress!
There is plenty of room for improvement this year! Next post will be about my plans.

Tuesday, 16 April 2013

Intermediate review of sewing 2013: first 3 months


So 3 months of 2013 passed and I want to look on my plans for this year and see the progress and the fields on which I should concentrate.

Let's see:

  • to make 20 items - I made 3. I hope to increase my sewing speed because I want to make some summer tops and skirts and this is more faster sewing tasks.
  • to decrease my fabric stash by 30 metres - BIG FAIL!  I will write about this separately. 
  • to finish my 3 UFOno progress. But I plan to make the skirt from the UFO list in April. 
  • to make different types of clothes (10 types) - I made 2, one in progress, well done!
    • to make last summer's projects - next month's task
    • to use patterns from different producers (8) - first one in progress only%(
    • to try to make The Big Project (a leather jacket) - I traced pattern, bought zippers(it was difficult to find ones), am looking for lining and am going to make muslin.
    • to make a catalog of my patterns - in progress, it is difficult task because I buy new magazines all the time.

    Just to add some pictures to this post - new residents (hope not permanent%)) of my stash!

    Linen for summer circle skirt
    For trousers
    Knit  - a long skirt and a t-shirt

    Monday, 28 January 2013

    My plans and wishes for 2013


    I should post my plans and wishes for sewing 2013 before I blog first FO of 2013%)) I wrote my plans a week or two ago but didn't have time to write them here. So let's start%) I should say that usually I plan more then I can do so this is something as plan maximum or more like my wishes.

    Once in last November I with Semeon bet if I could make 50 items in 2 year so first item in my plan is
    • to make 20 items in this year including some big refashion and home items too. I should make a counter for this my challenge%)) (Update 03/05 - 8 items done)
    Then
    • to decrease my fabric stash by 30 metres (fail,fail)
    • to finish my 3 UFO -  silk dress, gray dress, brown skirt. They all in my winter sewing list, so hope I will manage with this.(no progress)
    • to make different types of clothes (not only skirts%)) 
      • pants
      • jacket
      • jacket (warm)
      • dress - done
      • blouse - done
      • skirt - done
      • vest
      • male shirt
      • top
      • bag
    • to make last summer's projects - 2 dress and the pants. (no progress)
    • to use one retro pattern, pattern from Big 4, one pattern from La Mia Boutique, Patrones, Simplicity, Diana Moden, KnippMode + Ottobre. (I changed one big 4 for Ottobre - 15/04).
    • to try to make The Big Project - a leather jacket. I have a leather piece, I choose a pattern, I only should start %) (Looking for lining, planning to make muslin)
    • to make a catalog of my patterns. This is not a easy task because I bought a lot of Burda magazines and each magazine has a lot of patterns%) (in progress)



    Related Posts Plugin for WordPress, Blogger...