I decided that I had to concentrate on my stashbusting. To be more exact, on not increasing it%) So I will not buy any new fabric before I finish 5 specific garments. If I finish them I can by one or two pieces of fabric during my May trip.
So this is my list
Turtleneck 09/2010- already finished- Raglan Shirt Burda 02/2013 from light green rayon - pattern is traced
Knit dress Burda 11/2012 from grey knit wool- doneSkirt from KnippMode from red check wool- doneBirthday dress- done
| Fabrics for long sleeves |
![]() |
| This should be birthday dress |
| Skirt from KnippMode |
